PRODUCTION / CAPACITY: Production speeds of up to 1,100 KG of paste in 13 minute batch cycles. Typical with cooling is 15 to 17 minutes. Dependent on the type of chemistry (Tetrabasic or Tribasic) to be achieved.
PRODUCTION / CAPACITY: Production speeds of up to 1,300 KG of paste in 13 minute batch cycles. Typical with cooling is 15 to 17 minutes. Dependent on the type of chemistry (Tetrabasic or Tribasic) to be achieved.
PRODUCTION / CAPACITY: Production speeds of up to 1,650 KG of paste in 13 minute batch cycles. Typical with cooling is 15 to 17 minutes. Dependent on the type of chemistry (Tetrabasic or Tribasic) to be achieved.
PRODUCTION / CAPACITY: Production speeds of up to 550 KG of paste in 13 minute batch cycles. Typical with cooling is 15 to 17 minutes. Dependent on the type of chemistry (Tetrabasic or Tribasic) to be achieved.