PRODUCTION
75 to 200 feet per minute (23 to 61
meters / minute)
GRID SIZE CAPABILITY
- Overall length, over panel frames:
- 4.0" to 12.0" (101.6mm to 304.8mm)
- Maximum overall length:
- 13.0" (330mm)
- Grid strip thickness:
- 0.010" to 0.100" (0.25mm to 2.54mm)
PASTING RANGE
0.006" to 0.40" (.15mm to 1.0mm) above nominal grid strip thickness
PASTING TOLERANCES
- Weight:
- Nominal plus or minus 2 grams (0.0044lb)
- Thickness:
- Nominal plus or minus 0.002" (0.054mm)
REQUIRED PASTE PARAMETERS
Moisture: 10 to 14 %
Density:Cube weight 62 to 74 grams / cubic
inch (3.78 to 4.51 grams / cu cm)
Penetration: 20 to 30 (Global penetrometor
#1)
Fiber additives: Maximum length 0.06"
(1.5mm) of "non-balling" type fiber
TYPICAL MACHINE UP TIME
90%+ of disposable time per shift
TOOLING CHANGEOVER TIME
Change in grid/plate height: 15 minutes
Change in grid/plate thickness: 0 minutes for change of +/- 0.015" (0.4mm)
from nominal thickness setting
10 minutes for change greater than
+/- 0.015" (0.4mm) from nominal setting
PHYSICAL DIMENSIONS
Paste Machine
Overall Length: 123.25" (3131mm)
Overall Width: 33.7" (856mm)
- Floor to top of hopper
- In down position: 60.69" (1542mm)
- In up position: 71.50" (1816mm)
Floor to top of belt: 36.38" (924mm)
Floor space: 17.5 sq. ft. (1.63 sq. meters)
|
|
GENERAL SPECIFICATIONS
- Pasting tolerance of plus or minus 2 grams.
- Plate thickness of plus or minus 0.002" (0.54mm).
- Increased plate and battery performance.
- Increased productivity, machine speeds up to 200 feet per minute.
- Cleans up environmental problems.
- No cloth pasting belts.
- No shovel back of paste into the hopper.
- Every plate consistent in size, reduces production problems.
- Plate thickness can be adjusted while paster is operating +/- 0.015" (0.4mm) from nominal thickness setting.
- Change over time for grid/plate height 15 minutes.
- PLC Control with operator interface.
UTILITY REQUIREMENTS
Electrical
Power Input: 460v, 60hz, 3-phase standard
200v to 575v, 50hz or 60hz, 3-phase available upon request
Approximate power consumption: 20 KVA
All wiring conforms to NFPA. Build to special, or IEC (CE) codes available.
Compressed Air
Supply pressure to be 65 to 85 PSI (4.48 to 5.86 bars)
Air consumption is approximately 1 cubic foot per hour (for intermittent hopper
tilt and hopper latch cylinder operation)
Process Water
Supply pressure to be 20 to 50 PSI (1.38 to 3.45 Bars)
Maximum consumption rate during machine operation is 6 GPH, for metal belt
and roller cleaners (22.7 liters/hour). A solenoid valve limits water spray
application to periods of machine operation only.
Requires clean water source with minimum mineral solids content connected to _ inch NPT inlet cartridge filter.
Note:
1) Drainage required at Paster for process water and machine wash-down water.
2) Daily machine wash-down is recommended using high-pressure water. (900-
1200 PSI or 62 to 82 Bars, at about 2 gallons or 7.57 liters / minute rate)
VENTILATION EXHAUST
None provided. Customer to supply if required by local Code.
|